We all take a lot for granted. Turn on the taps, flick on the lights, turn up the heat, toss food in the fridge. I certainly don't often think much about the 'magic' that goes into supporting the rather easy life I live. It hasn't escaped my notice though, that getting anywhere is made a lot easier by the fact that there are a lot of people involved in creating all this magic (applied science). It's kind of funny really, because I'm one of those Arts grads (from long ago) who was dismissive of anything outside my tiny world view. I will only say, that in my older age, I've grown up a bit, and appreciate it greatly when I step out to walk across a bridge, or get on a bus, or turn on my car, that there are Science grads too.

some of the tools
This past week it's become a little bit more visible how that magic is created. My little neighbourhood has been turned  temporarily upside down by an extremely complicated hydro project, one that is intended to increase capacity for power in nearby areas. It's not surprising, when you stop to think about it, which we don't often, that there would have to be some new wiring put in here and there to support the myriad new buildings that keep appearing on our landscape. Each time a new tower goes up, it's like a new village is added, sometimes a small town, except it goes up, rather than out. It has to plug in somewhere.

strange beast
Project management is visible everywhere, made concrete by the appearance of bulldozers, flag-people, hardhats, heavy equipment operators (lots of 12 hour shifts) email updates, traffic diversions, shuttle buses, and the inevitable delays of any renovation project. It's also made visible by the appearance of seven 850 metre long pipes stretched in a bundle along West 8th Avenue, looking for all the world like some exo skeleton, or a sea serpent (on a solid sea), stretching some five or six blocks. It was dragged up here during the night, after being assembled alongside the oh-so-briefly-used streetcar tracks stretching between Granville Island and the Olympic Village station.

The pipe bundle was pulled along West 6th Avenue (blocking traffic completely, and snarling up Broadway for miles) up Willow Street, and then laid out along West 8th, where I found it when I was trying to walk up to Broadway a few days ago.

the pipe bundle was capped, to pull it to the holding area
It made for a much longer walk than I'd planned (I didn't bother hopping on the shuttle) but also a lot more interesting one than I usually find around here.

the bundle diving into
the ground
Yesterday the bundle started to move. It makes a turn now down Laurel Street, and then at West 7th slides into a bore hole. It is being pulled through (not pushed) across False Creek into David Lam Park. Lots of machinery and hardhats over there too. It might be finished today. Maybe tomorrow. I've had renovations done, so I know it'll be done when it's done.
the crane, just visible at the
centre of this photo, is where the
pipe bundle is diving underground

The pipe bundle will be encased with concrete, which will insulate and protect it. The drilling mud gets sucked out the other end by vacuum trucks. Eventually the pipes will house cable, connected to a new substation to keep our city chugging along, while we inevitably complain about rising rates.

The tranquil view to the right doesn't show it, but the pipe bundle is there, inching it's way under False Creek. The crane where the pipe bundle goes underground is just visible right in the centre of the picture.

1 comment:

BC Hydro said...

Hi Shirley – it’s the VCCT team at BC Hydro. We came across your post and just wanted to say thanks for sharing your thoughts on the project – great post! We know the project has had impacts on the neighbourhood and it’s always nice to hear from people in the area first-hand.

If you have any more feedback you’d like to share with us directly, feel free to get in touch anytime at 604 623 4472 or give us a shout by email at stakeholderengagement@bchydro.com.

Thanks again for posting – we’ll be sure to keep you updated as the project progresses.